Morris Turnberry Blyth Creek Municipal Drain (RFP-HP-18-01) 

0
1818
morris turnberry

Project opportunity information provided by DataBid.com. See more comprehensive information at the DataBid site.

Stage Open – Bids/Quotes/Tenders
Sector Public
Project/Bid No. RFP-HP-18-01
DataBid ID 0025101818
Project Location Various/Multiple, Morris ON
(Huron) , Canada
Project Class Heavy/Civil
Industry Heavy/Highway/Utilities
Trade Sewer/Drainage Utilities

Bids Due November 02, 2018 11:00 AM –
Municipal Office
Bids Due To   Municipality of Morris Turnberry
Estimated Cost Estimate Not Available

Additional Project Location
Contract No. 300035955.0000

The proposed Municipal Drain is located between Lots 13 and 17, Concessions 8 and 9 in the geographic Township of Morris, Municipality of Morris-Turnberry, County of Huron

Detail of Services
The Work Includes:

• Approximately 1299 m of channel deepening and reshaping approximately 680 m of sediment removal and reshaping and 117 m of spot deepening. Also including the construction of rock grade control structures and sediment basins and hydroseeding.
• New twin 1670 mm X 1300 mm diameter smoothwall galvanized steel arched pipe culverts for landowner crossing.
• Investigation and construction of six (6) concrete struts in the existing box culvert crossing within the Moncrief Road right of way.
• Installation maintenance and removal of any temporary sediment control measures.
• Spreading/hauling and leveling of excavated material and seeding all disturbed ares and restoration and rehabilitation of the entire site.

Questions Contact
Nancy Michie
Phone: 519-887-6137
Fax: 519-887-6424
Email: nmichie@morristurnberry.ca

Ed DeLay
RJ Burnside & Associates Ltd.
Phone: 519-340-2014
Fax: 519-357-3624

Bid Bond $17,500.00
Project/Document Info
RJ Burnside & Associates Ltd. – A digital copy of the Bid Documents may be obtained, free of charge, from the Contract Administrator by contacting Lori Speiran, lori.speiran@rjburnside.com

DOW’s
Division 03 – Concrete
Concrete
Division 31 – Earthwork
Earthwork, Excavation and Fill
Division 32 – Exterior Improvements
Exterior Improvements, Planting
Division 33 – Utilities
Utilities, Storm Drainage Utilities, Culverts

LEAVE A REPLY

Please enter your comment!
Please enter your name here

I accept the Privacy Policy

This site uses Akismet to reduce spam. Learn how your comment data is processed.