HomeArchitecture/planningBarrie’s $41-million wastewater innovation centre moves closer to construction

Barrie’s $41-million wastewater innovation centre moves closer to construction

Ontario Construction News staff writer

Demolition and site preparation expected to begin this summer as the City of Barrie prepares for construction of the two-storey wastewater innovation centre at Bradford and John streets.

The new mixed-use building will include administrative, operational, maintenance and support spaces needed to accommodate the city’s growing wastewater treatment needs.

wastewater BarrieSite-plan approval has been received, demolition permits have been issued and a site servicing permit has been approved for the project, which will be located on several city-owned properties adjacent to the existing Barrie Wastewater Treatment Facility at 249 Bradford St.

Five existing buildings are scheduled to be demolished by the end of summer.

The 37,674 sq. ft. building is needed as Barrie’s population is projected to reach 175,000 residents by the end of the year.

wastewater BarrieWhile the facility will serve a highly functional purpose, the project’s design aims to challenge the traditional perception of public works buildings as purely utilitarian structures.

The project received a 2025 Canadian Architect Award of Excellence, recognizing the building’s architectural approach, environmental goals and connection to the community.

“This addition to a public-works facility decisively rejects the notion that architectural beauty is a luxury,” said Kelly Buffey, a juror for the award. “As a water treatment plant, it achieves remarkable architectural poise, elevating a once unseen utilitarian operation into an evocative building with a delightful civic presence.”

The building has been designed to complement the surrounding neighbourhood while targeting net-zero energy performance through renewable energy systems intended to reduce long-term operating costs.

Architects designed the elongated building massing to create a stronger street presence along Bradford Street. The main façade features lifted corners that acknowledge the site’s urban importance while highlighting the main entrance.

At night, expanded glazing at the building’s corners will allow it to serve as a visible civic landmark toward downtown Barrie.

A major architectural feature will be the use of 900-millimetre fluted weathering steel panels, designed to resemble large industrial pipes and reflect the building’s connection to water infrastructure.

The steel cladding also serves a practical purpose by helping regulate daylight, reducing glare and solar heat gain while improving comfort for building occupants.

The site layout will allow for a large rooftop solar array designed to offset annual operational energy use. A works yard and parking area will occupy the rear portion of the property.

Beyond supporting day-to-day operations, the Wastewater Innovation Centre is intended to serve as an educational link between the city’s infrastructure and the community.

The facility will act as an extension and public face of the wastewater treatment plant, helping residents better understand the complex processes involved in treating wastewater and protecting Lake Simcoe.

Barrie’s wastewater facility treats domestic, commercial and industrial wastewater by removing contaminants and pollutants before treated water is returned safely to the environment.

The process also allows the city to recover valuable resources, including energy through biogas and biosolids used as fertilizer.

In 2024, Barrie launched a pilot program aimed at optimizing biosolid production for neighbouring agricultural communities through a specialized centrifugal treatment process.

The Wastewater Innovation Centre is expected to become a visible symbol of that work, combining essential municipal operations with sustainability, education and civic design.

Robin MacLennan, Editor, Ontario Construction News
Robin MacLennan, Editor, Ontario Construction News
Robin MacLennan has been a reporter, photographer and editor at newspapers and magazines in Barrie, Toronto and across Canada for more than three decades. She lives in North Bay. After venturing into corporate communications and promoting hospitals and healthcare, she happily returned to journalism full-time in 2020, joining Ontario Construction News as Writer and Editor. Robin can be reached at rmaclennan@ontarioconstructionnews.com
RELATED ARTICLES
- Advertisement -